ConstructionAlert

Bridge over Miami River Along SW 1 Street Closed

The bridge on SW 1 Street over Miami River will be completely closed for approximately 40 days (from a start date of Sept. 3) to complete bridge repairs. This full closure will take place for 24 hours a day. The bridge will be re-opened by Monday, October 14, 2013. A detour will be provided to guide drivers and pedestrians around the work while the contractor completes the bridge repairs.

WHAT TO EXPECT (Detours):

Drivers coming to Downtown along SW 1 St from the West will see signs directing them to detour as follows:

  • turn south (right) at SW 8 Avenue,
  • turn east (left) at SW 8 Street,
  • continue straight to go into Brickell or,
  • turn north (left) at SW 2 Avenue, head over SW 2 Avenue Bridge to continue into Downtown

For more information, please contact FDOT Project Administrator Farhang Esmailzadeh, P.E. at (305) 640-7298, or Public Information Specialist Cari Mesa at (305) 640-7441 or Caridad.Mesa@dot.state.fl.us.

Click here for more information from FDOT.